ICAC
  • ABOUT
  • CONTACT US
  • CAPTURE TYPE
    • ATMOSPHERIC CAPTURE
      • BECCS
      • Coastal blue carbon
      • Direct air capture
      • Mineralization
    • FUGITIVE EMISSIONS CAPTURE
      • End use systems
      • Fuel transfer
      • Mine mouth/ventilation air methane
      • Pipelines
      • Well sites
    • INDUSTRIAL CAPTURE
      • BECCS
      • Chemical looping
      • Fuel cells
      • Oxy-fuel combustion
      • Post-combustion
      • Pre-combustion
  • UTILIZATION TYPE
    • LONG-TERM STORAGE
      • Carbon fibers
      • Cement
      • Plastics
      • Polymers
      • Steel
      • Synthetic materials
    • PERMANENT SEQUESTRATION
      • Enhanced oil recovery
      • Geologic formations
      • Saline formations
    • SHORT-TERM RECYCLING
      • Biodegradable plastics
      • Food and beverage
      • Process chemicals
      • Synthetic hydrocarbons
  • STAGE OF DEV
    • LAB
    • PILOT
    • DEMONSTRATION
    • COMMERCIAL
  • SEE ALL
    • Projects
    • Technologies
    • All
RESULTS Pipelines, Project, ALL, Complete

Atlas Gas Pipeline Project

Pipelines, Project, ALL, Complete

The project utilizes Jemena’s Daring Downs Pipeline to transport gas from Atlas Gas Field to the east coast’s gas market for use, brining new sources of gas to the market.

read more

Solvay Chemicals India (Solvay-Vishnu)

Process chemicals, Short-term Recycling, ALL, Complete

Industrial plant.

read more

Boryeong Power Station

Industrial Capture, Post-combustion, ALL, Complete

Testing an advanced amine CO2 capture solvent at a coal-fired power station in South Korea.

read more

CHEMCAP

Industrial Capture, Oxy-fuel combustion, Post-combustion, ALL, Complete

Pilot plant part of EU Horizon 2020.

read more

China Coal Bed Methane Technology Sequestration Project

Geologic formations, Permanent Sequestration, ALL, Complete

Testing coal seams in north-east China to determine if permeable and stable for CO2 absorption and methane production enhancement.

read more

Sinopec Projects

Geologic formations, Industrial Capture, Post-combustion, ALL, Complete

Owner/ operator of multiple CCS project sites.

read more

Mikawa Pilot Plant

Industrial Capture, Post-combustion, ALL, Complete

10 tons of CO2 per day captured from flue gas at Mikawa thermal power plant.

read more

Devon Energy

Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, ALL, Complete

Participated in a FEED study with Inventys for a 1,000 TPD CO2 capture plant.

read more

Alabama Power’s Miller Electric Generating Plant

Industrial Capture, Post-combustion, ALL, Complete

Pilot project using ADA-ES technology at a power station outside Birmingham, AL.

read more

Brindisi Power Plant Project

Geologic formations, Industrial Capture, Post-combustion, ALL, Complete

Enel and Eni’s project to test a number of solvents and CCS before investing in a larger CCS power plant in Porto Tolle.

read more

C2A2 Field Project- Le Havre

Geologic formations, Industrial Capture, Post-combustion, ALL, Complete

Demonstration from 2012-2015 of a retrofitted oxy-fuel boiler.

read more

Callide Oxyfuel Project

Geologic formations, Industrial Capture, Oxy-fuel combustion, ALL, Complete

Demonstration from 2012-2015 of a retrofitted oxy-fuel boiler.

read more

CarbFix 1 Project

Atmospheric Capture, Geologic formations, Direct Air Capture, ALL, Complete

CO2 storage from power plant.

read more

CASTOR

Geologic formations, Industrial Capture, Post-combustion, ALL, Complete

Demonstration of a post-combustion coal-fired plant in Denmark, testing three solvents.

read more

China Huaneng Group Project

Industrial Capture, Post-combustion, ALL, Complete

First coal-fired demonstration project at a coal-fired power plant.

read more

China Huaneng Group Shanghai Shidongkou Project

Geologic formations, Industrial Capture, Post-combustion, ALL, Complete

Second coal-fired demonstration project at a coal-fired power plant in Shanghai.

read more

Sinopec Qilu Petrochemical Project

Enhanced oil recovery, Industrial Capture, Post-combustion, ALL, Complete

CCS project in Shangdong Province, China at the Shengali coal-fired power plant.

read more

CIUDEN/ Compositilla Project

Industrial Capture, Oxy-fuel combustion, ALL, Complete

CO2 capture and transport technology project at coal-fired boiler.

read more

E.ON Kraftwerke Demonstration Plant

Industrial Capture, Post-combustion, ALL, Complete

Slipstream carbon capture project in Germany.

read more

EAGLE Project

Industrial Capture, Oxy-fuel combustion, ALL, Complete

Three-stage pilot project completed in 2019 for an IGCC oxygen-blown coal system.

read more

Ferrybridge Project

Industrial Capture, Post-combustion, ALL, Complete

Pilot project from 2011-2013 testing an amine-based, post combustion CO2 capture process, capturing 100 tons of CO2 per day from Ferrybridge power station.

read more

Hadong Project

Industrial Capture, Post-combustion, ALL, Complete

Tested dry regenerable solid sorbent technology with a fluidized-bed CO2 capture process.

read more

Hazelwood Project

Industrial Capture, Post-combustion, Synthetic materials, ALL, Complete

Formerly Australia’s largest CCS facility integrated into a power station.

read more

CaOling Project

Chemical looping, Industrial Capture, ALL, Complete

Testing post-combustion CO2 capture by calcium looping using flue gases at the ‘La Pereda’ test facility in Spain.

read more

Aberthaw Pilot Carbon Capture Facility

Industrial Capture, Post-combustion, ALL, Complete

Post-combustion capture from a coal-fired power plant in Wales.

read more

Buggenum Pilot Project

Industrial Capture, Synthetic hydrocarbons, Pre-combustion, ALL, Complete

Pilot plant at the Willem-Alexander power plant from 2011-2013.

read more

Fort Nelson CCS Project

Geologic formations, Industrial Capture, Permanent Sequestration, Pre-combustion, ALL, Complete

Pre-combustion capture at Spectra Energy’s Fort Nelson natural gas plant.

read more

GreenGen IGCC Project

Enhanced oil recovery, Industrial Capture, Pre-combustion, ALL, Complete

Project to capture CO2 from 400 MWe IGCC plant.

read more

ENCAP Project

Industrial Capture, Oxy-fuel combustion, ALL, Complete

EU-funded Enhanced Capture of CO2 aimed at developing and validating pre-combustion CO2 capture technologies for fossil-fired generation.

read more

Oxy-Combustion of Heavy Liquid Fuels Project

Industrial Capture, Oxy-fuel combustion, ALL, Complete

Testing Saudi Aramco and GE oxy-combustion technology with CO2 capture for difficult-to-burn fuels.

read more

Mountaineer Validation Project

Industrial Capture, Saline formations, Post-combustion, ALL, Complete

Capture and store CO2 from Mountaineer coal-fired power plant in deep saline formations.

read more

OCTAVIUS Project

Industrial Capture, Post-combustion, ALL, Complete

European project following CASTOR and CESAR projects.

read more

Wilhelmshaven Plant

Industrial Capture, Post-combustion, ALL, Complete

Pilot project in Germany capturing 70 tons of CO2 per day.

read more

MGSC Validation: CO2 Storage and EOR- Bald Unit Oil Field Test Site

Enhanced oil recovery, Permanent Sequestration, ALL, Complete

The Midwest Geological Sequestration Consortium (MGSC) tested CO2 injection in sandstone in the Mumford Hills oil field in Indiana, USA, gauging potential for large-scale CO2 storage from EOR.

read more

MGSC Validation: CO2 Storage and EOR- Sugar Creek Oil Field Test Site

Enhanced oil recovery, Permanent Sequestration, ALL, Complete

The Midwest Geological Sequestration Consortium (MGSC) tested CO2 injection in sandstone in the Mumford Hills oil field in Kentucky, USA, gauging potential for large-scale CO2 storage from EOR.

read more

MUSTANG Project

Saline formations, Permanent Sequestration, ALL, Complete

A project with nearly 40 collaborators.

read more

Nagaoka Storage Project

Geologic formations, Permanent Sequestration, ALL, Complete

First pilot CO2 injection test in Japan; 10,000 tons of CO2 stored between 2003-2005 in an onshore gas and oil field.

read more

Miranga CO2 Injection Project

Geologic formations, Permanent Sequestration, ALL, Complete

Injecting 370 tons of CO2 per day into the Miranga oil and gas field (onshore) to test a variety of technologies for future offshore storage.

read more

San Francisco International Airport Concrete Project

Cement, Long-term Storage, Project, ALL, Complete

Test at SFO airport comparing conventional concrete to Blue Planet concrete; The Blue Planet concrete met all required specificiations.

read more

QICS Project

Geologic formations, Permanent Sequestration, ALL, Complete

Completed study quantifying and monitoring the environmental impacts of storing CO2 geologically in sea beds.

read more

West Pearl Queen Project

Geologic formations, Permanent Sequestration, ALL, Complete

Completed feasibility test for CO2 storage in depleted in depleted oil and gas fields.

read more

Zama Field Validation Test

Enhanced oil recovery, Permanent Sequestration, ALL, Complete

Pilot project testing acid gas (70% CO2, 30% H2S) injection at the Zama oil fields for EOR.

read more

Jackson Dome/ Cranfield Early CO2 Injection Field Test Project

Enhanced oil recovery, Permanent Sequestration, ALL, Complete

CO2 from the Jackson Dome injection into the lower Tuscaloosa Formation.

read more
← PREVIOUS
  • ABOUT
  • CONTACT
  • CORRECTIONS
  • LOGIN
  • ICAC
  • © ICAC 2019