A plan to transport CO2 from cement plants to a terminal off the coast of Norway via ship technology.
First Gas CCS Plant
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, Project, ALL, In Planning
Starwood Energy Group Global LLC has agreed to back OGCI Climate Investments to develop what could be the world’s first natural gas power plant to capture CO2 at scale with the goal of capturing 90% of CO2 emissions.
REX-CO2 Project
Enhanced oil recovery, Geologic formations, Saline formations, Permanent Sequestration, Project, Lab, ALL
The REX-CO2 project will develop a procedure and tools for evaluating existing hydrocarbon wells for CO2 storage, helping stakeholders make informed decisions on the potential re-use of certain wells or fields. A key output will be a software tool, developed – using case study evaluations from the six participating countries – for screening and assessing wells for their re-use potential.
CHS Refinery
Enhanced oil recovery, Industrial Capture, Post-combustion, Pilot, ALL
Serves as a secondary site for the ICKan project.
Sunflower Electric: Holcomb Plant
Enhanced oil recovery, Industrial Capture, Post-combustion, Pilot, ALL
Serves as a secondary site for the ICKan project.
Westar Energy: Jeffrey Energy Center
Enhanced oil recovery, Industrial Capture, Post-combustion, Pilot, ALL
Serves as the primary site for the ICKan project.
Fukuoka CO2 Recovery Plant
Enhanced oil recovery, Industrial Capture, Post-combustion, Commercial, ALL
Natural gas and heavy oil fired steam reformer using MHI’s KM CDR process to remove CO2 from flue gas.
Aonla CO2 Recovery Plant
Enhanced oil recovery, Industrial Capture, Post-combustion, Commercial, ALL
Natural gas fired steam reformer using MHI’s KM CDR process to remove CO2 from flue gas.
Kakinada CO2 Recovery Plant
Enhanced oil recovery, Industrial Capture, Post-combustion, Commercial, ALL
Natural gas fired steam reformer using MHI’s KM CDR process to remove CO2 from flue gas.
Vijaipur CO2 Recovery Plant
Enhanced oil recovery, Industrial Capture, Post-combustion, Commercial, ALL
Natural gas fired steam reformer using MHI’s KM CDR process to remove CO2 from flue gas.
Abu Dhabi/ Ruwais Fertilizers CO2 Recovery Plant
Enhanced oil recovery, Industrial Capture, Post-combustion, Commercial, ALL
Natural gas fired steam reformer using MHI’s KM CDR process to remove CO2 from flue gas.
Bahrain CO2 Recovery Plant
Enhanced oil recovery, Industrial Capture, Post-combustion, Commercial, ALL
Natural gas fired steam reformer using MHI’s KM CDR process to remove CO2 from flue gas.
Ghotoki CO2 Recovery Plant
Enhanced oil recovery, Industrial Capture, Post-combustion, Commercial, ALL
Natural gas fired steam reformer using MHI’s KM CDR process to remove CO2 from flue gas.
Phu My CO2 Recovery Plant
Enhanced oil recovery, Industrial Capture, Post-combustion, Commercial, ALL
Natural gas fired steam reformer using MHI’s KM CDR process to remove CO2 from flue gas.
Integrated CCS for Kansas
Enhanced oil recovery, Industrial Capture, Post-combustion, Pilot, ALL
Integrated CCS for Kansas.
Sandrige Energy- Century Plant
Enhanced oil recovery, Industrial Capture, Post-combustion, ALL
Natural gas plant.
Terrell Natural Gas Processing Plant (formerly Val Verde)
Enhanced oil recovery, Permanent Sequestration, Commercial, ALL
CO2 used for EOR.
Petra Nova Carbon Capture Project
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, Demonstration, ALL
World’s largest post-combustion CO2 capture system in operation.
Yanchang Integrated Carbon Capture and storage Demonstration
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, ALL, In Planning
Project to capture CO2 from chemical plants.
Abu Dhabi CCS
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, Commercial, ALL
World’s first fully functional CCS from iron and steel industry.
Alberta Carbon Trunk Line (ACTL) Project
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, ALL, In Planning
Industrial CO2 capture.
Jilin CCS Project
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, ALL
One of two national projects lead by PetroChina.
Ordos Project
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, Demonstration, ALL
Coal liquefication plant using solvent-based adsorption.
Lost Cabin
Enhanced oil recovery, Industrial Capture, Post-combustion, Commercial, ALL
Natural gas facility operated by ConocoPhillips.
ACDO/ ADFEC MASDAR Project
Enhanced oil recovery, Permanent Sequestration, Pilot, ALL
Testing EOR in carbonate reservoir in the MENA region of Abu Dhabi.
Pemex
Enhanced oil recovery, Permanent Sequestration, ALL
EOR project in Mexico.
ExxonMobil Hawkins Project
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, Commercial, ALL
Gas processing facility with EOR.
Koch Nitrogen- Enid Fertilizer
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, Commercial, ALL
Nitrogen fertilizer facility that produced high purity CO2.
Husky Energy Lashburn & Tangleflags Project
Enhanced oil recovery, Permanent Sequestration, Pilot, ALL
Testing methods for EOR in heavy oil reservoirs using CO2 captured Husky Energy’s Lloydminster ethanol plant.
Karamay Dunhua Project
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, Pilot, ALL
CCS at methanol plant.
Lake Charles Methanol Project
Enhanced oil recovery, Industrial Capture, Post-combustion, Short-term Recycling, ALL, In Planning
Proposed gasification facility to capture 4 Mtpa of CO2 from syngas.
Husky Energy
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, ALL, In Planning
CO2 captured for EOR.
Devon Energy
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, ALL, Complete
Participated in a FEED study with Inventys for a 1,000 TPD CO2 capture plant.
Texas Clean Energy Project
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, ALL
IGCC plant with CCS near Odessa, Texas.
Boundary Dam Polygon
Enhanced oil recovery, Industrial Capture, Post-combustion, Commercial, ALL
First generating station to successfully use CCS on one of its full scale units.
Sinopec Qilu Petrochemical Project
Enhanced oil recovery, Industrial Capture, Post-combustion, ALL, Complete
CCS project in Shangdong Province, China at the Shengali coal-fired power plant.
Great Plains Synfuel Plant and Weyburn-Midale
Enhanced oil recovery, Industrial Capture, Pre-combustion, Commercial, ALL
Natural gas to hydrogen conversion w/ CCS.
Uthmaniyah Demonstration
Enhanced oil recovery, Permanent Sequestration, Pilot, ALL
Saudi Arabia’s first CCS project.
Riley Ridge Gas Plant
Enhanced oil recovery, Permanent Sequestration, ALL, In Planning
2020 project planned following original 2012 project’s completion.
GreenGen IGCC Project
Enhanced oil recovery, Industrial Capture, Pre-combustion, ALL, Complete
Project to capture CO2 from 400 MWe IGCC plant.
Daqing CCS Project
Enhanced oil recovery, Industrial Capture, Oxy-fuel combustion, ALL
Using Alstom’s oxy-firing technology at a coal-fired plant in Daquing.
Coffeyville Gasification Plant
Enhanced oil recovery, Permanent Sequestration, Commercial, ALL
CO2 compression and dehydration at the Coffeyville Resources Nitrogen Fertilizers plant.
Placerita Project
Enhanced oil recovery, Industrial Capture, Pre-combustion, Pilot, ALL
Test site for Clean Energy Systems Technology.
Hydrogen Energy California Project
Enhanced oil recovery, Industrial Capture, Permanent Sequestration, Pre-combustion, ALL
Turned coal and petroleum coke into clean hydrogen energy while capturing the CO2 before it was emitted into the atmosphere– terminated in 2016.
PCS Nitrogen Project
Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, Commercial, ALL
Industrial facility: source of CO2 for EOR for Denbury Resources.
Sinopec Eastern China Project
Enhanced oil recovery, Post-combustion, ALL, In Planning
Project planned to capture CO2 from synthetic ammonia facility and coal-to-hydrogen facility.
Sinopec Zhongyuan Pilot Project
Enhanced oil recovery, Industrial Capture, Post-combustion, Commercial, ALL
Capturing <100,000 tons of CO2 per year from a petrochemical complex in Henan Province.
Project Tundra – Minnkota Power Cooperative Project
Enhanced oil recovery, Industrial Capture, Saline formations, Post-combustion, Permanent Sequestration, ALL, In Planning
Studying cost and design of CO2 capture at the Milton R. Young Power Station.
MGSC Validation: CO2 Storage and EOR- Bald Unit Oil Field Test Site
Enhanced oil recovery, Permanent Sequestration, ALL, Complete
The Midwest Geological Sequestration Consortium (MGSC) tested CO2 injection in sandstone in the Mumford Hills oil field in Indiana, USA, gauging potential for large-scale CO2 storage from EOR.
MGSC Validation: CO2 Storage and EOR- Sugar Creek Oil Field Test Site
Enhanced oil recovery, Permanent Sequestration, ALL, Complete
The Midwest Geological Sequestration Consortium (MGSC) tested CO2 injection in sandstone in the Mumford Hills oil field in Kentucky, USA, gauging potential for large-scale CO2 storage from EOR.