ICAC
  • ABOUT
  • CONTACT US
  • CAPTURE TYPE
    • ATMOSPHERIC CAPTURE
      • BECCS
      • Coastal blue carbon
      • Direct air capture
      • Mineralization
    • FUGITIVE EMISSIONS CAPTURE
      • End use systems
      • Fuel transfer
      • Mine mouth/ventilation air methane
      • Pipelines
      • Well sites
    • INDUSTRIAL CAPTURE
      • BECCS
      • Chemical looping
      • Fuel cells
      • Oxy-fuel combustion
      • Post-combustion
      • Pre-combustion
  • UTILIZATION TYPE
    • LONG-TERM STORAGE
      • Carbon fibers
      • Cement
      • Plastics
      • Polymers
      • Steel
      • Synthetic materials
    • PERMANENT SEQUESTRATION
      • Enhanced oil recovery
      • Geologic formations
      • Saline formations
    • SHORT-TERM RECYCLING
      • Biodegradable plastics
      • Food and beverage
      • Process chemicals
      • Synthetic hydrocarbons
  • STAGE OF DEV
    • LAB
    • PILOT
    • DEMONSTRATION
    • COMMERCIAL
  • SEE ALL
    • Projects
    • Technologies
    • All
RESULTS Enhanced oil recovery, Industrial Capture, Post-combustion, Pilot, ALL

CHS Refinery

Enhanced oil recovery, Industrial Capture, Post-combustion, Pilot, ALL

Serves as a secondary site for the ICKan project.

read more

Sunflower Electric: Holcomb Plant

Enhanced oil recovery, Industrial Capture, Post-combustion, Pilot, ALL

Serves as a secondary site for the ICKan project.

read more

Westar Energy: Jeffrey Energy Center

Enhanced oil recovery, Industrial Capture, Post-combustion, Pilot, ALL

Serves as the primary site for the ICKan project.

read more

University of Newcastle Carbon Mineralization

Atmospheric Capture, Mineralization, Synthetic materials, Pilot, ALL

Pilot project for Mineral Carbonation International in Sydney, Australia.

read more

SoCalGas Power-to-Gas

Synthetic hydrocarbons, Short-term Recycling, Pilot, ALL

Research part of SoCalGas’ development of technologies known as poser-to-gas (P2G), a method of storing excess renewable energy.

read more

LEILAC Project

Cement, Industrial Capture, Post-combustion, Pilot, ALL

Low Emissions Intensity Lime and Cement Project sponsored by EU Horizon 2020.

read more

CO2MENT Project

Cement, Long-term Storage, Pilot, ALL

CCUS demonstration project planned for 2019-2020 at Lafarge’s Richmond cement plant.

read more

Norcem Brevik Project

Industrial Capture, Post-combustion, Pilot, ALL

CO2 capture tests at cement plant.

read more

ECRA CCS Project

Industrial Capture, Synthetic hydrocarbons, Post-combustion, Pilot, ALL

Long-term project to assess the economic and technical feasibility of CCS for the cement industry.

read more

SRI International-Global Thermostat Demonstration Project

Atmospheric Capture, Geologic formations, Direct Air Capture, Pilot, ALL

Location of Global Thermostat’s pilot/ demonstration of DAC technology.

read more

Atmospheric CO2 Enrichment and Delivery (ACED) Project- ASU

Industrial Capture, Post-combustion, Pilot, ALL

Feed algae biomass in 1,500-liter raceway ponds at the Arizona Center for Algae Technology and Innovation (AzCATI) national testbed.

read more

Integrated CCS for Kansas

Enhanced oil recovery, Industrial Capture, Post-combustion, Pilot, ALL

Integrated CCS for Kansas.

read more

University of Kentucky Center for Applied Energy Research

Geologic formations, Industrial Capture, Post-combustion, Pilot, ALL

Pilot plant for advanced carbon capture.

read more

Technology Centre Mongstad

Geologic formations, Industrial Capture, Post-combustion, Pilot, ALL

Chilled NH3 system from Alstom and amine system from others

read more

Tomakomai CCS Demonstration Project

Geologic formations, Industrial Capture, Post-combustion, Permanent Sequestration, Pilot, ALL

Industrial capture & sequestration demonstration project in Tomakomai, Japan.

read more

Otway Basin Pilot Project

Geologic formations, Permanent Sequestration, Pilot, ALL

Australia’s first demonstration project of deep storage of CO2.

read more

Carbon2Chem

Process chemicals, Short-term Recycling, Pilot, ALL

16 partners from industry and science to convert CO2 emissions into chemical components.

read more

Dunkirk Project

Industrial Capture, Post-combustion, Pilot, ALL

Testing IFP Energies Nouvelle’s post-combustion capture demising solvent technology.

read more

ACDO/ ADFEC MASDAR Project

Enhanced oil recovery, Permanent Sequestration, Pilot, ALL

Testing EOR in carbonate reservoir in the MENA region of Abu Dhabi.

read more

Nanko Pilot Facility

Geologic formations, Industrial Capture, Post-combustion, Pilot, ALL

Multi-pollutant test facility, capturing CO2 from synthetic flue gas.

read more

Mihara Pilot Facility

Geologic formations, Industrial Capture, Post-combustion, Pilot, ALL

Multi-pollutant test facility, capturing CO2 from synthetic flue gas.

read more

Hiroshima Pilot Facility

Geologic formations, Industrial Capture, Post-combustion, Pilot, ALL

Multi-pollutant test facility, capturing CO2 from coal-fired kettle boiler.

read more

Husky Energy Lashburn & Tangleflags Project

Enhanced oil recovery, Permanent Sequestration, Pilot, ALL

Testing methods for EOR in heavy oil reservoirs using CO2 captured Husky Energy’s Lloydminster ethanol plant.

read more

K12-B Offshore CO2 Injection Project

Geologic formations, Industrial Capture, Post-combustion, Permanent Sequestration, Pilot, ALL

Project from 2004-2017, capturing and injecting 100,000 tons of CO2 back into K12-B gas field.

read more

Karamay Dunhua Project

Enhanced oil recovery, Industrial Capture, Post-combustion, Permanent Sequestration, Pilot, ALL

CCS at methanol plant.

read more

Karlshamn Field Project

Industrial Capture, Post-combustion, Pilot, ALL

Pilot power station project testing Alstom’s chilled ammonia process for CO2 capture.

read more

Wyoming Integrated Test Center

Industrial Capture, Post-combustion, Pilot, ALL

Public-private partnership to test CCUS from a coal-fired power plant.

read more

Jamestown Project

Industrial Capture, Oxy-fuel combustion, Pilot, ALL

Linde/Foster Wheeler demonstration project for CCS facility.

read more

Barry Power Station Project

Geologic formations, Industrial Capture, Post-combustion, Pilot, ALL

CO2 capture from Southern Company’s coal-fired power plant

read more

Nagasaki Project

Industrial Capture, Post-combustion, Pilot, ALL

CO2 capture from J-Power’s Matsushima coal-fired boiler flue gas.

read more

Collie-South West Hub CCS Project

Geologic formations, Permanent Sequestration, Pilot, ALL

Feasibility study for CCS in Western Australia’s Lesueur Sandstone.

read more

STEPWISE Project

Industrial Capture, Pre-combustion, Pilot, ALL

Swerea Mofes- ECN collaboration in Lulea, Sweden.

read more

Uthmaniyah Demonstration

Enhanced oil recovery, Permanent Sequestration, Pilot, ALL

Saudi Arabia’s first CCS project.

read more

Retznei Project

Industrial Capture, Oxy-fuel combustion, Pilot, ALL

Testing Thyssenkrupp oxy-fuel technology.

read more

Colleferro Project

Industrial Capture, Oxy-fuel combustion, Pilot, ALL

Testing Thyssenkrupp oxy-fuel technology.

read more

Oxy-fired Pressurized Fluidized Bed Combustion (Oxy-PFBC) Project

Industrial Capture, Oxy-fuel combustion, Pilot, ALL

Testing oxy-fuel technology at a 1 MWth pilot facility.

read more

Kimberlina Oxyfuel Project

Geologic formations, Industrial Capture, Oxy-fuel combustion, Pilot, ALL

Testing Clean Energy Solutions’ oxy-fuel technology with sequestration underneath the plant (WESTCARB).

read more

Placerita Project

Enhanced oil recovery, Industrial Capture, Pre-combustion, Pilot, ALL

Test site for Clean Energy Systems Technology.

read more

NET Power Large-Scale Pilot Facility

Industrial Capture, Pre-combustion, Pilot, ALL

Testing NET Power’s proprietary Allam Cycle technology at a large-scale natural gas-fired power plant in Houston, Texas since 2018.

read more

Pleasant Prairie Power Plant Project

Industrial Capture, Post-combustion, Pilot, ALL

Completed pilot project at the We Energies power plant in Wisconsin to test Alstom’s Chilled Ammonia post-combustion carbon capture technology.

read more

Renfrew Oxyfuel Project

Industrial Capture, Oxy-fuel combustion, Pilot, ALL

Completed pilot project studying oxy-fuel technology (40 MW burner) from 2007-2011 in Renfrew, Scotland.

read more

Shand Carbon Capture Test Facility

Industrial Capture, Post-combustion, Pilot, ALL

Partnership between SaskPower and MHPS; Captures CO2 from coal-fired Shand Power Station for vendors to test amine-based, post-combustion capture technologies.

read more

Orlando Utilities Commission – Stanton Energy Center

Food and beverage, Project, Short-term Recycling, Pilot, ALL

Stanton Energy Center demonstration; Joint DOE demonstration project to study microalgae commodities (i.e. animal feed) from coal plant flue gas CO₂ and/or renewable gas production.

read more

Upslope Brewing Company CO₂ to Ink Project

Project, Short-term Recycling, Pilot, ALL

Partners w/ Boom Algae on pilot algae greenhouse to gather data on algae growth, CO₂ capture, and energy use and costs; CO₂ waste from Upslope’s beer fermentation process is converted into 100% biodegradable, non-petroleum-based, algae-ink.

read more

Michigan Basin Large-Scale Injection Test

Enhanced oil recovery, Permanent Sequestration, Pilot, ALL

Inject and monitor CO2 at sites being used for EOR.

read more

The Coca Cola Company – Plant-based Plastic Bottles

Biodegradable plastics, Project, Short-term Recycling, Pilot, ALL

Technology development agreement to accelerate the development of mono-ethlyene (MEG) from CO₂; Coca Cola uses MEG to make their plant-based plastic bottles.

read more

San Juan Basin Storage Test

Geologic formations, Permanent Sequestration, Pilot, ALL

Completed pilot project studying 18,000 tons of injected CO2 for ECBM recovery and CO2 storage.

read more

Bell Creek Project

Enhanced oil recovery, Permanent Sequestration, Pilot, ALL

Collaboration between Plains CO2 Reduction (PCOR) and Denbury Onshore EOR project.

read more

CarbonSAFE- North Dakota

Geologic formations, Permanent Sequestration, Pilot, ALL

2-year study (2017-2019) at Basin Electric Antelope Valley Station, Beulah to evaluate commercial readiness for geologic storage of CO2.

read more

Aquistore Project

Geologic formations, Permanent Sequestration, Pilot, ALL

Injects CO2 into sandstone.

read more
← PREVIOUS NEXT →
  • ABOUT
  • CONTACT
  • CORRECTIONS
  • LOGIN
  • ICAC
  • © ICAC 2019