Tesside Cluster Carbon Capture and Usage Project
In Planning
Tesside Cluster Carbon Capture and Usage Project
Technology Owner: Tesside Cluster Carbon Capture and Usage Project
About: Industrial capture; Located at the SSI Redcar Bulk Terminal; Comprises the development of a Combined Cycle Gas Turbine gas-fired generating station and gas (2100 MW), electricity, and cooling water connections with post-combustion carbon capture and compression plant; Together with a gathering station for CO2 from the generating station and other industrial sources, low-pressure CO2 pipeline connections to potential industrial sources, and a high-pressure CO2 pipeline for the onward transport CO2 to an offshore geological storage site in the North Sea.
Application: Industrial Capture/Utilization
Type: Post-Combustion
Utilization: Geologic Storage
Location: United Kingdom
Partners: n/a
Categories: ALL